The Waiting Game: How Long Does Screed Take To Dry?

Laying down screed can be a precise but difficult process. At Singh Concrete, we understand the importance of having a properly dried screed floor. A properly dried screed floor not only ensures that the floor is level and strong but also helps to prevent any damage that may occur due to moisture. In this article, we will be discussing everything you need to know about drying screeds, including the recommended drying time, methods of drying, and how to ensure a successful drying process.

You’ve landed on this page because you want to know the answer… and we will give it to you right away:

How Long Does Screed Take To Dry?

Screed dries within 48 hours. The recommended drying time for the screed can vary depending on the type of screed being used. Most screeds recommend a drying time of 24-48 hours per 1 mm of screed thickness. This means that a 50mm thick screed floor should dry for approximately 2-4 weeks before any further work can be carried out. However, it is important to note that these are only general guidelines, and the drying time can be affected by several factors such as the ambient temperature and humidity levels.

What Is Screed Used For?

Screed is primarily used in the construction industry as a levelling layer for floors, prior to the installation of a final floor finish. It is a mixture of cement, sand, and water, and can also include additives such as plasticizers to improve its workability and drying time. Screed can be used to level uneven concrete or subfloor surfaces, create a smooth surface for the installation of tile or carpet, and can also provide insulation or soundproofing properties. Additionally, screed can be used as a wearing surface for commercial and industrial environments, providing a hard-wearing and durable surface for heavy foot traffic and machinery.

How Do You Make Screed Dry Faster?

If you’re working with screed, you’re likely wondering how to make it dry faster. The good news is that there are several ways to speed up the drying process. 

Here are some tips to help you make the screed dry faster:

By using these tips, you can help to speed up the drying process and get your screed ready for the next stage of your project.

How Do You Know When A Screed Floor Is Dry?

Determining when a screed floor is dry is a critical step in ensuring that subsequent flooring installation is successful. The drying time for screed varies depending on several factors such as the thickness of the screed, type of screed used, environmental conditions, and drying conditions.

To determine whether a screed floor is dry, a moisture test is usually conducted. A moisture test measures the moisture content of the screed and ensures that it is at an acceptable level for the installation of the chosen flooring. The most common method used is the calcium carbide moisture test, which involves drilling a small hole into the screed and inserting a calcium carbide test capsule. The capsule reacts with the moisture in the screed, producing acetylene gas, which is measured by a pressure gauge. The pressure reading obtained is then compared to a chart to determine the moisture content of the screed.

Another method of testing for moisture content is the relative humidity (RH) test, which involves placing a probe on the surface of the screed floor and measuring the relative humidity of the air within the screed. This method is becoming increasingly popular due to its accuracy and speed.

It is essential to ensure that the screed is completely dry before installing any flooring material. If the screed is not dry enough, it may cause the flooring material to warp or buckle, leading to costly repairs. Therefore, it is recommended that a professional screeding company is employed to install and test the screed floor to ensure that it is dry and ready for flooring installation.

Determining when a screed floor is dry is crucial for ensuring successful flooring installation. Moisture testing is the most reliable method for determining the moisture content of the screed, and it should be conducted by a professional to ensure that the screed is dry and ready for flooring installation.

Factors That Affect Screed Drying Time

Several factors affect screed drying time, including:

Type of Screed

There are different types of screed, such as cement-based, calcium sulphate-based, and anhydrite-based. Each type has a different drying time, with anhydrite-based screed taking the longest to dry.

Thickness

The thicker the screed, the longer it takes to dry. A thin layer of screed will dry faster than a thick layer.

Humidity

High humidity levels slow down the drying process, while low humidity speeds it up.

Temperature

The higher the temperature, the faster the screed will dry.

Ventilation

Adequate ventilation helps the drying process by allowing moisture to evaporate quickly.

Methods of Drying

There are two main methods of drying screed: natural drying and forced drying. Natural drying is the most common method of drying screed and involves allowing the screed to dry naturally over time. This method is ideal for smaller areas where there is no need for a quick drying process. On the other hand, forced drying is a quicker method of drying screed that involves using external heating systems to speed up the drying process. This method is ideal for larger areas or projects with tight schedules.

Ensuring a Successful Drying Process

To ensure a successful drying process, it is essential to follow a few simple steps. Firstly, it is important to ensure that the screed is laid correctly and that the correct thickness is achieved. Secondly, allowing the screed to dry for the recommended time is important before any further work is carried out. Thirdly, it is important to monitor the ambient temperature and humidity levels to ensure that they are within the recommended range for drying screed. Lastly, it is important to use a moisture metre to check the moisture content of the screed before any further work is carried out.

Does Screed Dry Quicker In Heat Or Cold?

Generally, screed dries quicker in warmer temperatures, so it may dry faster in heat than in cold. This is because warmer temperatures help to increase the rate of evaporation, which is necessary for the screed to dry properly. However, it is important to note that excessively high temperatures can also lead to the screed drying too quickly, which can cause cracking and other issues. The ideal temperature range for screed drying is typically between 10°C and 20°C. It is also important to maintain a consistent temperature during the drying process to ensure that the screed dries evenly and without any defects.

Common Mistakes to Avoid When Screeding Your Floors

When it comes to screeding floors, it’s essential to get it right the first time to avoid costly and time-consuming mistakes. 

Here are some common mistakes to avoid when screeding your floors:

 

Not properly preparing the subfloor

One of the most common mistakes when screeding floors is not preparing the subfloor properly. Before screeding, ensure the subfloor is clean, level, and free from debris or contaminants that may affect the bonding of the screed to the substrate. Any bumps, cracks or holes in the subfloor should be filled, and if necessary, primed to improve adhesion.

Incorrect mixing ratios

Another common mistake is not mixing the screed correctly. Different screeds have different mixing ratios, and it’s important to follow the manufacturer’s instructions to get the right consistency. Adding too much or too little water can affect the strength and durability of the screed.

Improper application techniques

Applying screed requires skill and experience. One common mistake is not applying the screed evenly or not using the correct tools. To achieve a level surface, use a straight edge or screed rails to guide the screed across the floor.

Not allowing enough time to dry

Screed needs time to dry and cure properly. Rushing the drying process can lead to cracking and weakening of the screed. It’s important to follow the manufacturer’s recommendations for drying times and environmental conditions to ensure the screed dries evenly and without issues.

Ignoring the importance of expansion joints

Expansion joints allow the screed to expand and contract without cracking. Not installing expansion joints or installing them incorrectly can lead to unsightly cracks and a weakened screed.

By avoiding these common mistakes when screeding your floors, you can ensure a durable and long-lasting finish. If you’re unsure about any aspect of screeding, it’s always best to seek the advice of a professional to avoid any costly mistakes.

Concrete Drying Time FAQ’S

Concrete takes about 28 days to dry for every inch of slab thickness. Concrete will be ready for foot traffic, within 24 – 48 hours. 

If the finishing process is fully complete and the concrete is completely stiffened, rainwater may cause a little damage. However, that being said, rainwater can also be beneficial for concrete in the curing and drying process as it moisturises and hydrates the concrete.